Omega Owners Forum
Chat Area => General Discussion Area => Topic started by: Debs. on 29 June 2009, 18:30:08
-
The largest hydro-electric scheme to be built in Britain for 50+ years, opens today.
0 to 100 megawatts in 90 seconds!
http://news.bbc.co.uk/1/hi/sci/tech/8125066.stm
http://www.glendoe.co.uk/project/reservoir_and_dam.html
-
Although it's location dependant Debs, it's just the sort of big project we excelled at :y
It’s lovely to see engineering on this scale. Do we still have the talent.... or the will....or the foresight? :-/ :-/
-
It’s lovely to see engineering on this scale. Do we still have the talent.... or the will....or the foresight? :-/ :-/
Looking at the list of contractors, no!
Has its place though. Having said that, with Six Units at drax providing frequency responce, we can provide an extra 660MW in 10 seconds ::)