Chat Area => General Discussion Area => Topic started by: pscocoa on 14 February 2014, 17:34:25

Title: Kitchen project
Post by: pscocoa on 14 February 2014, 17:34:25
Has quietly been underway for a week plus some preparatory work before that  - moving radiators putting in French doors and refurbing a spare room to take all the crap out of kitchen to create space.

Quiet until today that is......3 plasterers arrived at 8 am sharp and they are still here - singing loudly, swigging tea, laughing and joking..... Bit of a contrast to joiner, electrician, plumber and general builder
Title: Re: Kitchen project
Post by: Shackeng on 14 February 2014, 18:09:57
3 plasterers? For 8 hours? to do one room? :o
Title: Re: Kitchen project
Post by: Kevin Wood on 14 February 2014, 18:50:01
3 plasterers? For 8 hours? to do one room? :o

Has quietly been underway for a week plus some preparatory work before that  - moving radiators putting in French doors and refurbing a spare room to take all the crap out of kitchen to create space.

Quiet until today that is......3 plasterers arrived at 8 am sharp and they are still here - singing loudly, swigging tea, laughing and joking..... Bit of a contrast to joiner, electrician, plumber and general builder

 ;)
Title: Re: Kitchen project
Post by: pscocoa on 14 February 2014, 19:21:12
3 plasterers? For 8 hours? to do one room? :o

 35 sq metres of ceiling plus they stripped kitchen sink and stuff out to do behind. They were projecting 1pm finish before but said weather would delay job. Fixed price so no problem for me.
Title: Re: Kitchen project
Post by: pscocoa on 14 February 2014, 19:22:15
Actually it was 2 plasterers plus a gopher.
Title: Re: Kitchen project
Post by: aaronjb on 14 February 2014, 19:32:51
35m2 is some kitchen ceiling.. that's a whole house down in my neck of the woods! ;D
Title: Re: Kitchen project
Post by: PhilRich on 14 February 2014, 19:48:51
35m2 is some kitchen ceiling.. that's a whole house down in my neck of the woods! ;D
[/highlight]



Its about the size of our local General Hospital! It's grim oop north ;D ;)
Title: Re: Kitchen project
Post by: redelitev6 on 15 February 2014, 18:22:02
3 plasterers? For 8 hours? to do one room? :o

 35 sq metres of ceiling plus they stripped kitchen sink and stuff out to do behind. They were projecting 1pm finish before but said weather would delay job. Fixed price so no problem for me.
You need to get that leaky roof fixed first ?
Title: Re: Kitchen project
Post by: pscocoa on 20 February 2014, 10:51:44
Project experience wearing a bit thin now....waiting around for granite template then a weeks wait, floor levelling, and lots of odds and ends as they connect all the appliances.

I went for an English Kitchen Range but when all the units and appliances turned up already assembled (nothing flat packed) absolutely everything from Germany. I mistakenly thought the carcasses were from Mereway in Birmingham.

In all the building changes between us we forgot about a soil stack which was concealed behind a corner cooker hood which I cannot move so will not be the exact job I intended.
Title: Re: Kitchen project
Post by: GastronomicKleptomaniac on 20 February 2014, 17:32:25
35m2 is some kitchen ceiling.. that's a whole house down in my neck of the woods! ;D


Its about the size of our local General Hospital! It's grim oop north ;D ;)

To be fair, my kitchen is both larger and better equipped than your local hospital... ;)
Title: Re: Kitchen project
Post by: pscocoa on 20 February 2014, 20:55:19
First day on new oven...ready meal left for me to put in for 25 mins whilst she has gone out for a meal with friends