changed the cable ties for P clips today, total pain in the a$$ but the job has been done n accordance with COP II
The bolts on the tank frame have been changed for longer ones that go through the chassis legs.
Anyway the day progress......
started at 8:45 with the filler, this was going to be bumper mounted like the last one, i had painted it already,

first thing was to mask the area

Having done one before it doesn't get any easier, drilling the bumper wrong will render it useless.

Behind the bumper is a reinforcement this needs to be cut back

once the filler had been fitted

and once the bumper had been refitted

from there it was a case of feeding the filler pipe to the tank, the first thing was to drill and fit the sleeve, this is part of the LPGA COP II, from the tank there is a tube that sits over the filler tube, this is to allow gas escape if required

Once this had been done the outlet tube was also done in the same was, from there it was on to the interior
The kit comes with warning buzzer and switch/fuel gauge, i had decided all of this would be mounted on the centre console

stripped back and ready for wiring and dummy fit with the warning buzzer

and finally installed

the vaporiser wiring has been completed, all that remains is the RPM signal and lambda sensors needs connecting, had the two nozzles not been broken it would have been running tonight with finishing off tonight